Frico Group has contributed to the construction of the E16 section between Bjørum and Skaret
Frico Group has contributed to the construction of the E16 section between Bjørum and Skaret. This project, carried out in collaboration with Skanska, is a significant infrastructure project that will improve transport links and road safety in the region.
Project: E16 Bjørum — Skaret
Contractor: Skanska
Location: Bjørum to Skaret, Norway
Phase: Ongoing
Main components:
The purpose of the project is to build a new four-lane motorway of 8.4 km between Bjørum and Skaret. This includes the construction of two highway intersections, two tunnels, five bridges, and large amounts of mass displacement. The aim is to improve road safety, reduce travel time and increase capacity on this important stretch of road.
Cuplok Travel
Frico Group supplied Cuplok travel works for the project. This flexible and secure scaffolding system was used to support the construction in various phases of the work. The Cuplok travel plant is known for its durability and ability to adapt to complex construction requirements.
Mabey Universal Truss
Mabey Universal trusses were utilized to provide additional structural support. This system offers high strength and stability, which was essential to ensure the safe and efficient construction of the highway.
MAT Tower
The MAT towers used in the project contributed to height adjustment and stability during construction. These towers are designed to withstand high loads, making them ideal for large infrastructure projects like this.
Steel Beams
A considerable amount of steel girders were supplied to ensure the robustness and durability of the structure. The steel beams provide a sturdy frame that can withstand the heavy loads from traffic on the new highway.
Stairtower/Access
Frico Group has also supplied stair towers and access solutions for the project. These structures ensure safe and easy access to different levels of the construction site, which is essential for efficient and secure workflow.
Work scaffolding
Work scaffolding is critical to ensure the safe and efficient execution of construction work. Frico Group has delivered reliable and flexible work postures that can be customized as needed, making it easier to carry out complex work tasks safely.
Skanska to build new $800 million bridge over Ytre Steinsund
Frico Group has contributed to the construction of the E16 section between Bjørum and Skaret
Contact us and you will hear from us shortly. We look forward to discussing how we can assist with your next project.