For hire

Scaffold Shoring

Using our patented F-Cup system or Cuplok. F-Cup is aluminium and therefore incredibly lightweight.

  • Response within 48 hours
  • Our own engineers
  • Delivery and installation
How we work

From enquiry to fully installed

  1. 1

    Needs and site visit

    We look at the site, the loads and the timeframe, and propose the right solution.

  2. 2

    Engineering

    Our own engineers design the solution and prepare the documentation you need.

  3. 3

    Delivery and installation

    We deliver and install, coordinated with other work on site.

  4. 4

    Follow-up and dismantling

    We follow up the solution in use and dismantle it when the job is done.

Ready for a quote?

Send us an enquiry about Scaffold Shoring and we will respond within 48 hours, with no obligation.