MARINE & OFFSHORE

Scaffolding and access for marine and offshore projects

Frico supplies scaffolding, access, shoring and weather protection to shipyards, terminals and offshore installations – built for the marine environment, tidal movement and work close to live operations.

Services

Everything the marine project needs

We supply scaffolding, access and shoring for new build, maintenance and repair alongside the quay, in dock and at facilities along the coast.

01

Ship and rig scaffolding

Scaffolding and safe access around hulls, decks and superstructures – in dock, alongside the quay and at facilities at sea.

02

Shoring and propping

Engineered solutions for section lifts, repairs and installation where load capacity and stability are critical.

03

Weather protection and encapsulation

Temporary roofs and sheeting that make surface treatment and welding possible in wind, salt and rain.

04

Stair towers, platforms and access

Safe movement between quay, deck and working areas – including where the height difference changes with the tide.

05

Installation, inspection and dismantling

Our own crews install, inspect and dismantle – coordinated with yard operations and the site safety regime.

06

Special structures

Engineered solutions for demanding geometry, restricted space and tasks where standard systems fall short.

48 hours
response time on enquiries – anywhere in Norway.

Time alongside the quay is expensive. We plan installation and removal around the docking window so the vessel sails on the agreed date.

Marine work

How we help marine and offshore

The marine environment places its own demands on materials, anchoring and documentation. We supply solutions that withstand salt, wind and movement – documented as yards and operators require.

YARDS AND DOCK

New build and repair

Scaffolding, access and shoring through the whole docking period, planned around a fixed sailing date.

TERMINALS AND QUAYS

Facilities along the coast

Solutions for maintenance and rebuilding of quays, terminals and loading structures in operation.

OFFSHORE

Installations at sea

Access and shoring for offshore maintenance and modification, planned around logistics and weather windows.

How we work

Ready before docking

Once the docking window is set, everything has to be planned in advance. We coordinate engineering, equipment and crews so the access is ready when the vessel arrives.

1

Site visit and planning

We look at the vessel or facility, the access and the docking plan – and propose the solution that fits.

2

Documented solution

Our engineers size the solution and produce the documentation required.

3

Installation

Certified crews install the solution, coordinated with yard operations and other work on board.

4

Inspection and removal

We inspect and adjust the solution as work proceeds, and dismantle when it is finished.

Frequently asked questions about marine projects

Who supplies scaffolding and temporary structures to shipyards and offshore installations in Norway?

Frico supplies scaffolding, access, shoring, weather protection and special structures to shipyards, terminals and offshore installations along the whole Norwegian coast.

Yes. We plan the work around operations and the docking plan, follow the yard’s safety regime and coordinate with other work on board.

With a large stock and our own installation crews, we can act quickly – you will get a response to your enquiry within 48 hours.

Yes. Most customers hire with installation included, but we also sell equipment. See the hire pages for more.

Are you planning a docking or a marine project?

Tell us about the vessel or facility, the time window and the access you need – and we will propose a solution and an estimate.