A national road in Vestland is closed by flooding. The bridge is damaged, bridges in the area are inaccessible, and the alternative diversion is more than 80 kilometres. Within a few days the consequences for business and emergency services can become serious. It is not a permanent structure that saves the situation here, it is an emergency bridge.
An emergency bridge is a temporary bridge structure that is assembled quickly to maintain passage when permanent infrastructure is damaged, closed or not yet built. It is engineered to the current load classes in accordance with NS-EN 12812:2008, and designed to meet the same safety requirements that apply to equivalent permanent infrastructure, with a clear framework for period of use and operation. Frico Group offers temporary bridge solutions as part of a complete project offering: from engineering design and permit handling to assembly and dismantling under one roof.
This article looks at the difference between temporary and permanent bridge structures, the most important bridge types in Norway, and key technical figures for the country’s best-known bridges.
Temporary bridges vs. permanent bridges: what is the actual difference?
Permanent bridges are typically designed for a 100-year service life and built in reinforced concrete, steel or combinations of both. They require deep foundations, long construction times and detailed ground investigations. Temporary bridges are modular steel structures designed for rapid assembly and a limited operating period. Depending on ground conditions and accessibility, they can be erected on existing abutments or simple pile foundations within hours to days.
“Temporary” does not mean unsafe. Certified temporary bridges are engineered to the same load classes and safety requirements as permanent structures. NS-EN 12812:2008 requires temporary structures to be documented to class B1 or B2, with requirements for structural calculations, ground conditions and foundations. It is the time horizon and the assembly method that set them apart, not the safety level.
Approval requirements and regulatory framework
Both types of structure are regulated by the Norwegian Planning and Building Act and the Norwegian Public Roads Administration’s handbook series, but temporary structures have their own procedures for time-limited permits. An application for a temporary bridge typically includes structural calculations, design drawings, load class documentation and a clear time frame for use and dismantling.
If the bridge is placed such that a collapse could affect national or county roads, the Norwegian Public Roads Administration requires notification at least three weeks before design material is submitted, in line with the Administration’s current guidance for temporary road works. Independent design review in accordance with road standard N400 is mandatory. The process is structured, but considerably faster than for permanent works, which is crucial in crisis scenarios.
The most important bridge types in Norway
Suspension bridges, arch bridges and cable-stayed bridges
A suspension bridge carries the bridge deck on vertical hangers from main cables strung between pylons. Norway’s two longest suspension bridges are the Hardanger Bridge with a 1,310-metre main span, opened in 2013, and the Hålogaland Bridge north of the Arctic Circle with a span of around 1,145 metres, opened in 2018. The Askøy Bridge, opened in 1992, stretches over 850 metres in total and is known by the nickname “the Pearly Gates” for its distinctive night lighting.
An arch bridge transfers the load to the abutments via an arch. The new Svinesund Bridge is a Norwegian example, where the carriageway runs partly beneath the arch in an inclined design. Cable-stayed bridges attach cables directly from tower to bridge deck, without the curved cable shape we know from suspension bridges. The Skarnsund Bridge holds the record as Norway’s longest cable-stayed span at 530 metres and was opened in 1991.
Floating bridges, truss bridges and beam bridges
A floating bridge rests on pontoons and is relevant where the fjords are too deep for traditional piers. The Nordhordland Bridge is an existing example of a combined floating and cable-stayed bridge, opened in 1994. Future projects include the Bjørnafjord Bridge, planned at more than five kilometres over around 600 metres of water depth. Truss bridges use triangular steel members to carry the deck and are common for railways and longer river bridges. The Flisa Bridge over the Glomma is a well-known Norwegian example. The beam bridge is the simplest type of structure, with beams resting directly on piers, and is widely used for shorter road bridges over smaller watercourses. Modular emergency bridges are in practice beam or truss structures in steel, precisely because this geometry is best suited to rapid prefabrication and on-site assembly.
Key technical figures for Norway’s well-known bridges
Longest bridges by total length and main span
The Drammen Bridge is Norway’s longest bridge with a total length of 1,892 metres, built as a box girder bridge. It is followed by the Nordhordland Bridge at 1,610 metres, the Hålogaland Bridge at 1,533 metres and the Hardanger Bridge with a total length of 1,380 metres and a 1,310-metre main span. The Hardanger Bridge also has a clearance of 55 metres and is among the ten longest suspension bridges in the world. The pylons are between 200 and 202.5 metres high, the tallest structures on the Norwegian mainland apart from antenna masts.
It is worth distinguishing between “total length” and “main span”, because they give different rankings. Total length includes all parts of the bridge, including approach spans and ramps, while the main span measures only the longest continuous span without support. The Skarnsund Bridge, for example, is not among the longest overall, but holds the record for the longest cable-stayed span in Norway at 530 metres. For an overview of how bridges are ranked by total length and span, see also a combined list of bridges in Norway by length.
Iconic bridges for tourists and photographers
The Old Town Bridge in Trondheim is among the highest-rated bridges in Norway on travel platforms such as Tripadvisor. The historic 18th-century wooden bridge over the Nidelva is easily reached on foot from the city centre and offers classic urban photo motifs. The Tromsø Bridge ranks close behind and is known for its iconic profile against the northern lights and fjord landscape.
The Hardanger Bridge scores highly and is easily reached from the E16 with dedicated viewpoints on both sides of the fjord. The Askøy Bridge outside Bergen is popular with photographers for its curved shape against the cityscape and its night lighting, which has earned it the nickname “the Pearly Gates”. All four bridges can be reached by car, and the Hardanger and Askøy bridges have their own stopping points for views and photography. See also a photo series on Norway’s most beautiful bridges for inspiration for photo stops.
When is an emergency bridge the right choice?
Emergency bridges are actively used in civil engineering projects where an existing bridge or road has to be closed for rehabilitation, and where a diversion is too long or too costly. A typical scenario is a municipal road bridge over a river that is to be rehabilitated over one construction season. A temporary beam bridge is assembled alongside to maintain traffic for residents and businesses while the work is under way, without anyone having to take a detour of many kilometres. Temporary bridges are also used to give construction machinery access to sites where a permanent road has not yet been established. In such cases the load class and foundations are designed for heavy vehicles from day one, and the bridge can be dismantled and reused on the next project as soon as the permanent infrastructure is in place.
Emergency preparedness for floods, landslides and bridge collapses
Climate change increases the risk of extreme precipitation and flood damage to Norwegian road infrastructure. Emergency bridges are an established part of municipal and national crisis management; in many cases a modular bridge can be transported to the site and assembled within 24 to 72 hours, depending on ground conditions, span length and accessibility. This mobility makes them irreplaceable in acute situations where permanent repair can take months.
Other use scenarios include military preparedness, temporary access to islands or mountain installations where a fixed bridge is lacking, and large outdoor events that need controlled traffic management over water or changes in terrain. What recurs across all these situations is the need for infrastructure that can be deployed quickly, certified and dismantled when the task is complete.
From engineering to assembled bridge: what the process looks like
The first step is a needs analysis and site visit where the engineers map span length, load requirements, ground conditions and accessibility for transport and assembly equipment. On that basis, structural design, choice of structure type and the application for a temporary permit to the municipality and, where relevant, the Norwegian Public Roads Administration are carried out. The design basis is just as thorough as for permanent structures; it is the time horizon and the assembly method that differ. See for example Frico Group’s work on the project New infrastructure at Nydalsbrua for the practical execution of such processes.
After approval, the equipment is delivered to the site, assembly is carried out, and the bridge is put into operation with ongoing inspection during the operating period. When the need has been met, the structure is dismantled and the equipment is returned or reused on the next project. The whole process is documented and verifiable, as regulatory requirements demand.
Frico Group as a full-service partner for temporary bridges
Frico Group supplies temporary bridge solutions and handles the entire project cycle under one roof: engineering design, permit handling, assembly, operational follow-up and dismantling. That means you as a customer do not have to coordinate between several subcontractors in a situation that is already demanding enough. The company serves both municipal and private clients and covers the full spectrum from simple site access to complex emergency projects in demanding terrain. Read more about Frico’s services under Bridges and emergency response.
Flexibility is central to the delivery model. Through the Frico Sales Hub, customers can hire, buy or combine solutions adapted to the project’s duration and budget. A short-term rehabilitation project can be solved with hire, while clients with a frequent need for temporary bridges may find it worthwhile to buy and own their own equipment. See also concrete examples such as the project New bridge over Ytre Steinsund for a reference on implementation in demanding coastal conditions.
An emergency bridge is not a stopgap, it is planned infrastructure
The choice between temporary and permanent bridges is about time horizon, load requirements and cost, not about safety level. An emergency bridge is engineered and certified to the same load classes, documented just as thoroughly and followed up with ongoing inspection throughout the operating period. It is an infrastructure component on a par with what it replaces, just with a different time frame.
Norway has some of Europe’s most demanding bridge routes, from the Hardangerfjord’s 1,310-metre span to the future floating bridge projects over the Bjørnafjord at around 600 metres of water depth. The expertise built up around Norwegian bridges, in construction, design and emergency preparedness, is a direct result of the geographical challenges the country presents.
Need advice on temporary bridges for your next project? Get in touch with Frico Group, or explore the Frico Sales Hub for available equipment for hire and purchase.