PROJECT

E6 Soknedal

Shoring and falsework for the new E6 through Soknedal. Frico Group supplied Cuplok falsework, trusses, MAT towers, hydraulic solutions and steel beams to AF Anlegg during the construction of the new E6 stretch through Soknedal.

New road and tunnel through Soknedal

AF Anlegg built 6.5 kilometres of new E6 between Vindåsliene and Korporalsbrua for the Norwegian Public Roads Administration. The project comprised a 3.6-kilometre tunnel, 2.9 kilometres of open road and several new bridges.

The new road routes through traffic around Soknedal town centre and has improved road safety and shortened travel times.

Frico’s delivery

Frico supplied shoring and falsework for the work on the bridges and structures along the stretch of road.

The delivery consisted of Cuplok falsework, trusses, MAT towers and steel beams. Hydraulic solutions were used for controlled height adjustment and handling of the shoring during the construction works.

Building in demanding terrain

The project ran through steep terrain and included bridge works by the flood-prone river Sokna. The work also had to take into account that the river is an important spawning ground for salmon.

E6 Soknedal was officially opened in October 2020.

Facts about the project

  • Project: E6 Soknedal
  • Location: Midtre Gauldal in Trøndelag
  • Client: Norwegian Public Roads Administration
  • Contractor: AF Anlegg
  • Frico’s delivery: Cuplok falsework, trusses, MAT towers, hydraulic solutions and steel beams
  • Road length: 6.5 kilometres
  • Tunnel: 3.6 kilometres
  • Opened: October 2020
  • Sector: Infrastructure
  • Solution: Shoring and falsework

About the project

LOCATION
PERIOD
SERVICES

Photos from the project

More projects

E18 Langangen–Rugtvedt – midlertidig gangbru

E18 Langangen–Rugtvedt – temporary footbridge

Slottsfjellfestivalen

Slottsfjellfestivalen

Tons of Rock

Tons of Rock