At Hallandsåsen, Veidekke built a wildlife crossing over the E6 in 2021, one of Sweden’s busiest motorways.

The crossing gives animals a safe route over the motorway, reduces wildlife collisions and preserves natural migration paths. The work was carried out with a focus on sustainability and environmentally friendly construction methods.

Two gantries over the E6

Frico Group supplied and erected two gantries over the E6, together with working decks and falsework covering around 75 metres each. The gantries made it possible to pour the crossing over the road while traffic continued to flow underneath.

The project shows how Frico Group handles pours over live roads with gantries, working decks and falsework in one system.

Project facts

  • Project: E6 Hallandsåsen
  • Contractor: Veidekke
  • Hire period: 2021
  • Number of bridges: 1 (wildlife crossing)
  • Structure: 2 gantries over the E6, working decks and falsework of approx. 75 m each
  • Sector: Infrastructure

About the project

LOCATION
Hallandsåsen, Sweden
PERIOD
2021
SERVICES
Gantries, working decks and falsework

Photos from the project

More projects

E18 Langangen–Rugtvedt – midlertidig gangbru

E18 Langangen–Rugtvedt – temporary footbridge

Slottsfjellfestivalen

Slottsfjellfestivalen

Tons of Rock

Tons of Rock