Frico supplies engineered solutions to two of the contracts on the E18 Vestkorridoren in Bærum. The delivery comprises shoring, falsework and scaffolding for a new pedestrian and cycle bridge, tunnel portals, a ventilation hall and Ramstadsletta bridge, among others.
New E18 west of Oslo
E18 Lysaker–Ramstadsletta is the first stage of the E18 Vestkorridoren. The project will provide better accessibility, a continuous cycle network and a new local road system through Bærum.
Skanska is carrying out E102 and E103 for the Norwegian Public Roads Administration. The contracts comprise the new E18 between Fornebukrysset and Ramstadsletta, parts of the Høvik tunnel and the Gjønnes tunnel, the western link to Fornebu and a number of bridges and concrete structures.
E102 – pedestrian and cycle bridge over Fornebukrysset
On E102, Frico supplies shoring and working scaffolds for the new pedestrian and cycle bridge over Fornebukrysset.
The bridge is built from prefabricated steel elements that are transported to the site and lifted into place on MAT towers built by Frico. The towers are fitted with hydraulic jacks that make it possible to fine-tune the height of each element before the bridge sections are welded together.
Frico also builds working scaffolds for welders and painters around the steel elements. The scaffolding is clad with shrink wrap to shield the work area during welding and surface treatment.
Once the steel elements are joined and the bridge can carry itself, the shoring is lowered in a controlled manner and the MAT towers are removed.
The delivery comprises:
- MAT towers for shoring of the steel elements
- hydraulic jacks for precise height adjustment
- working scaffolds for welders and painters
- encapsulation with shrink wrap
- controlled lowering and removal of the shoring
One of the bridge elements installed in August 2026 was 44 metres long and weighed 75 tonnes.
E103 – Høvik tunnel and Ramstadsletta bridge
On E103, Frico supplies shoring and falsework for several of the large concrete structures. The work comprises tunnel portals, a ventilation hall, portal roofs and the more than 310-metre-long Ramstadsletta bridge.
Frico engineers and assembles Cuplok falsework with aluminium beams and H20 beams. The falsework supports the formwork during casting and is adapted to the geometry, loading and construction sequence of each structure.
The delivery comprises:
- Cuplok falsework for tunnel portals and ventilation hall
- shoring and falsework for Ramstadsletta bridge
- aluminium beams and H20 beams
- engineering, drawings and calculations
- assembly, dismantling and follow-up
The engineering is carried out in accordance with NS-EN 12812. By combining engineering, equipment and assembly in one delivery, Skanska gets solutions adapted to the different parts of E103.
Two contracts – several demanding structures
The deliveries to E102 and E103 show how Frico combines engineering, equipment and practical execution in major infrastructure projects.
From height adjustment of prefabricated bridge elements to falsework for tunnel portals and concrete bridges, each solution is planned around the structure and the work to be carried out.
Project facts
- Project: E18 Lysaker–Ramstadsletta
- Part of: E18 Vestkorridoren
- Contracts: E102 Fornebukrysset–Strand and E103 Strand–Ramstadsletta
- Customer: Skanska
- Client: Norwegian Public Roads Administration
- Location: Bærum
- Frico’s delivery on E102: MAT towers, hydraulic height adjustment, working scaffolds and encapsulation
- Frico’s delivery on E103: Engineering and Cuplok falsework for tunnel portals, ventilation hall, portal roofs and Ramstadsletta bridge
- Construction period: 2022–2030