E12 Umeå is a major infrastructure project in which the contractor PEAB built five new bridges in the Umeå region in 2020–2021.

The bridges are essential for efficient and safe traffic on the E12, one of the most important transport routes in northern Sweden. Around 4,000 cubic metres of concrete were used in the project.

Falsework for five bridges

Frico Group supplied and erected falsework and access scaffolding for the bridge pours. The scaffolding was designed for the heavy concrete loads and adapted to each bridge, so the pours could be carried out on schedule.

The project shows how Frico Group contributes scaffolding solutions and experience to large bridge projects in Sweden.

Project facts

  • Project: E12 Umeå
  • Contractor: PEAB
  • Hire period: 2020–2021
  • Number of bridges: 5
  • Concrete volume: approx. 4,000 m³
  • Solutions: Falsework and access scaffolding
  • Sector: Infrastructure

About the project

LOCATION
Umeå, Sweden
PERIOD
2020–2021
SERVICES
Falsework and access scaffolding

Photos from the project

More projects

E18 Langangen–Rugtvedt – midlertidig gangbru

E18 Langangen–Rugtvedt – temporary footbridge

Slottsfjellfestivalen

Slottsfjellfestivalen

Tons of Rock

Tons of Rock