Working scaffolds and access for the steel structures on the new city bridge. Drammen city bridge has become a new landmark in the city. Frico Group supplied Cuplok working scaffolds and access for the work on the bridge’s steel structures.
A new connection through the city
Drammen city bridge connects Bragernes torg, Strømsø torg and Drammen station. The 270-metre bridge crosses the Drammenselva and the railway area at Strømsø.
The bridge has two lanes for public transport, cycle lanes and wide pavements. Stairs from the bridge give direct access to the railway platforms and the river promenade.
The new city bridge was opened in October 2025 and is designed as more than a connection over the river. The bridge and its surroundings form part of a continuous urban space between Bragernes and Strømsø.
Frico’s delivery
Frico supplied Cuplok working scaffolds for the work on the steel structures of Drammen city bridge.
The scaffolding was built from working platforms out in the river and adapted to the structure and the work to be carried out. The solution gave safe access to the steel structures throughout the construction period.
The delivery comprised:
- Cuplok working scaffolds
- stair towers and access
- brackets and internal guardrails
- assembly and dismantling
- adjustments along the way
Working in the middle of the Drammenselva placed special demands on assembly, logistics and coordination with cranes and other activities on site.
Internationally recognised
In 2026 Drammen city bridge received the DNA Paris Design Award in the category Architecture Design – Infrastructure & Transportation. The award highlights the bridge’s combination of function, architecture and significance for city life.
The bridge has also won the Tekla BIM Award 2026 in the infrastructure projects category.
Frico Group is proud to have contributed to the construction of Drammen’s new landmark.
Project facts
- Project: New Drammen city bridge
- Clients: Drammen municipality and Bane NOR
- Main contractors: PNC Norge and NCC
- Location: Drammen
- Length: 270 metres
- Width: 19.4 metres
- Main span: 86 metres
- Frico’s delivery: Cuplok working scaffolds, stair towers, access, assembly and dismantling
- Opened: October 2025
- Awards: DNA Paris Design Award and Tekla BIM Award 2026