Scaffolding solution for wall and roof works in Tønsberg.
The project
In connection with wall and roof works at Øvre Langgate 25 in Tønsberg, RWI Bygg needed a safe, flexible scaffolding solution.
The existing building and outdoor areas called for a solution that could be adapted to the conditions on the property while giving the tradespeople safe, efficient access to the work areas.
Frico Group’s delivery
On behalf of RWI Bygg, Frico Group supplied and assembled Cuplok masonry and facade scaffolding for the project.
The delivery comprised around 1,300 m² of scaffolding, plus stair towers and loading towers for safe access and efficient handling of materials. The scaffolding was adapted to the building’s facades and the local conditions to establish good, safe work areas.
Frico Group was also responsible for the engineering, assembly, follow-up and dismantling of the scaffolding solution.
Local scaffolding solutions adapted to the project
With a yard and expertise locally in Tønsberg, Frico Group supplies scaffolding and access solutions to builders, contractors and trade businesses in Vestfold.
The project at Øvre Langgate shows how a flexible scaffolding solution can be adapted to existing buildings and local conditions, while safety and efficient execution are maintained.
Project facts
- Customer: RWI Bygg
- Location: Tønsberg, Norway
- Solutions: Masonry and facade scaffolding, stair towers and loading towers
- System: Cuplok