PROJECT

E16 Åsbygda–Olum

Falsework, scaffolding and access for nine bridges and structures on the new E16. Frico Group supplied around 42,000 m³ of engineered Cuplok falsework to Skanska during the construction of the new E16 through Jevnaker.

A new, safer E16

Skanska built around 11 kilometres of new European highway for the Norwegian Public Roads Administration. The project comprised 15 bridges and other structures, in addition to new junctions, pedestrian and cycle paths and local roads.

The new road has moved through traffic out of Jevnaker town centre and improved road safety and accessibility.

Frico’s delivery

Frico supplied falsework for nine bridges and structures along the new stretch of road. The delivery comprised Cuplok falsework, aluminium beams and steel beams, adapted to the various structures.

We also supplied working scaffolds and stair towers that gave safe access during the construction works.

Finished ahead of schedule

E16 Åsbygda–Olum opened in December 2021, seven months before the original deadline. The project was a climate pilot project for the Norwegian Public Roads Administration and achieved the “Very Good” rating under BREEAM Infrastructure.

Facts about the project

  • Project: E16 Åsbygda–Olum
  • Location: Jevnaker
  • Client: Norwegian Public Roads Administration
  • Design-and-build contractor: Skanska
  • Frico’s delivery: Around 42,000 m³ of Cuplok falsework, aluminium beams, steel beams, working scaffolds and stair towers
  • Scope: Nine bridges and structures
  • Opened: December 2021
  • Sector: Infrastructure
  • Solutions: Shoring and falsework, scaffolding and access

About the project

LOCATION
PERIOD
SERVICES

Photos from the project

More projects

E18 Langangen–Rugtvedt – midlertidig gangbru

E18 Langangen–Rugtvedt – temporary footbridge

Slottsfjellfestivalen

Slottsfjellfestivalen

Tons of Rock

Tons of Rock