PROJECT

Nydalsbrua

Falsework, scaffolding and access during the construction of the new bridge on national road 706 in Trondheim. Nydalsbrua has become a new landmark in Trondheim. Frico Group held a design-and-build subcontract for Skanska and supplied falsework, scaffolding and access during the construction of the extensive road project.

New connection over the Nidelva

Nydalsbrua is part of national road 706 and crosses the Nidelva at Sluppen in Trondheim. The 183-metre cable-stayed bridge has a main span of 112 metres and a distinctive, inclined pylon rising 55 metres above the river.

The project also comprised new roads, cycle facilities, ramp bridges, bridges over the Leirelva and tunnel portals for the future Byås tunnel. Skanska carried out the project as design-and-build contractor for the Norwegian Public Roads Administration.

Frico’s delivery

Frico’s design-and-build subcontract comprised falsework, scaffolding and access for the main bridge and several of the associated structures.

The delivery included, among other things:

  • falsework for bridge decks, bridge piers, ramp bridges and tunnel portals
  • MAT towers and steel beams for demanding shoring
  • stair towers, working scaffolds and access
  • assembly, inspection and adjustments along the way

The solutions were adapted to the various structures, loads and construction phases. By combining the delivery in one design-and-build subcontract, Skanska had one partner for all of Frico’s part of the work.

Recognised in Norway and internationally

Nydalsbrua opened to traffic in October 2023, eight months ahead of schedule. The same year the bridge received the Betongtavlen 2023 award for its technical and aesthetic design.

In 2024 Nydalsbrua won the category for smaller road and railway bridges at the international IABSE Awards in Zürich. The project also received the overall Gold Star Award.

Frico Group is proud to have contributed to the completion of this important connection over the Nidelva.

Project facts

  • Project: National road 706 Nydalsbrua with connections
  • Customer: Skanska
  • Client: Norwegian Public Roads Administration
  • Location: Trondheim
  • Contract form: Design-and-build subcontract
  • Bridge type: Cable-stayed bridge
  • Bridge length: 183 metres
  • Main span: 112 metres
  • Frico’s delivery: Falsework, MAT towers, steel beams, scaffolding, stair towers, assembly and follow-up
  • Opened: October 2023
  • Awards: Betongtavlen 2023 and two IABSE awards in 2024

About the project

LOCATION
PERIOD
SERVICES

Photos from the project

More projects

E18 Langangen–Rugtvedt – midlertidig gangbru

E18 Langangen–Rugtvedt – temporary footbridge

Slottsfjellfestivalen

Slottsfjellfestivalen

Tons of Rock

Tons of Rock