PROJECT

Drammen station – Sundhaugen (UDK03)

Drammen stasjon – Sundhaugen (UDK03)

Frico Group supplied shoring, falsework and access for the expansion of Drammen station.

The project

The expansion of Drammen station–Sundhaugen (UDK03) is an extensive railway project in Drammen. Frico Group supplied solutions to NCC Norge AS for several parts of the project, including the railway trough and the portals at Austadveien and Gunnerud.

The project’s various structures called for flexible solutions for shoring, work and safe access.

Frico Group’s delivery

On behalf of NCC Norge AS, Frico Group supplied Cuplok shoring and falsework for several structures in the project.

The delivery comprised around 1,900 m³ of falsework spread across the railway trough and the portals at Austadveien and Gunnerud. The systems were used for shoring of the culvert and portal structures. Frico was also responsible for engineering its own equipment in accordance with NS-EN 12812.

In addition, the delivery included Cuplok working scaffolds and access solutions, including stair towers and solutions for reinforcement works.

Flexible solutions for a complex infrastructure project

An extensive railway project with several structures and work areas requires solutions that can be adapted to the structure, the loading and the schedule.

The combination of shoring and falsework, scaffolding, access and technical engineering made it possible for Frico Group to deliver several temporary structures within the same project.

Project facts

  • Customer: NCC Norge AS
  • Location: Drammen, Norway
  • Project: UDK03 Drammen station–Sundhaugen
  • Solutions: Shoring and falsework, scaffolding and access
  • System: Cuplok
  • Scope: approx. 1,900 m³ of falsework

About the project

LOCATION
PERIOD
SERVICES

Photos from the project

More projects

E18 Langangen–Rugtvedt – midlertidig gangbru

E18 Langangen–Rugtvedt – temporary footbridge

Slottsfjellfestivalen

Slottsfjellfestivalen

Tons of Rock

Tons of Rock